Building a factory in former Hai Duong (Hai Phong): process, permits and what drives the cost

Building a factory in former Hai Duong (Hai Phong): process, permits and what drives the cost

A guide to building factories and warehouses in and outside industrial parks in former Hai Duong: choosing land, permits, fire safety, pre-engineered steel structures and the factors that change the cost, from PQT's construction experience.

Former Hai Duong (now part of Hai Phong city) sits between Hanoi and Hai Phong port, served by National Highways 5, 18, 37 and 38 and the Hanoi – Hai Phong expressway, which makes it a familiar choice for manufacturers. Here is what investors should know about building a factory in Hai Duong, from PQT's industrial construction experience.

1. Inside or outside an industrial park?

Inside a parkOutside a park
LandSub-leased serviced land, clear proceduresMust match zoning, longer procedures
InfrastructureRoads, power, water, wastewater readyOwner connects utilities
Best forFDI and regulated manufacturingSmall and mid-size workshops, warehouses

Parks such as Dai An, Phuc Dien, Nam Sach, Tan Truong, Lai Vu and Cong Hoa each have preferred industries, so talk to the park management first.

2. Permits

Investment registration where required, land lease or land-use certificate, environmental procedures, fire-safety design approval under QCVN 06:2022/BXD, and a building permit.

3. Design decisions that drive cost

Span and height, crane capacity, floor loading and soft-soil treatment, roof and cladding, fire-safety class, and ancillary offices and canteens.

4. Pre-engineered steel

Most factories use pre-engineered steel frames fabricated off-site and bolted on site: fast, wide-span and easy to extend.

Cost

PQT does not quote a single rate for every factory; soil, span, crane loads, cladding, fire-safety level and external utilities make the difference. A reliable estimate needs a soil survey and a concept design. See PQT industrial projects or request a quote.