6 clear steps from idea to keys — you always know what is happening, how long it takes and what you receive

6 clear stages
18 construction work items
10 progress-based payments
24 months of warranty
Step 01 1 – 2 days

Consultation

We listen to your needs, lifestyle and budget to shape the scope from day one.

HICONIQUE does

  • Discuss needs, functions and preferred style
  • Advise on a preliminary concept and scope
  • Quick cost and timeline estimate

You receive

  • Preliminary cost estimate
  • Proposed scope of work
  • Site survey appointment

You prepare

  • Land documents or apartment drawings
  • Photos of the space and reference styles
  • Expected budget
Step 02 2 – 3 days

Site Survey

Our engineers measure and inspect the site so the design fits reality.

HICONIQUE does

  • Detailed measurement of every space
  • Check structure, sun and wind, electrical and plumbing
  • Note site conditions: access, working hours, building rules

You receive

  • As-built drawings
  • Survey report with photos
  • Design quotation

You prepare

  • Be present or authorise site access
  • Building / management fit-out rules
Step 03 7 – 14 days

Concept Design

Our architects develop the idea, space planning and 3D renderings so you can see it first.

HICONIQUE does

  • Functional floor plan
  • Material, colour and lighting moodboard
  • 3D renderings of key spaces

You receive

  • Layout options
  • 3D renderings
  • Revisions based on your feedback

You prepare

  • Feedback on the concept
  • Confirm style and functions

Design payment 1: 50% on signing the contract

Step 04 10 – 20 days

Detailed Design

Full technical drawings and a detailed estimate — every material and fixture is fixed before building.

HICONIQUE does

  • Architecture, structure, MEP and interior drawings
  • Quantity take-off and detailed estimate (BOQ)
  • Finalise materials and fixtures

You receive

  • Construction drawing set
  • Transparent detailed estimate
  • Construction contract and schedule

You prepare

  • Approve drawings and estimate
  • Confirm materials and fixtures

Payment 2: 30% on concept approval · Payment 3: 20% on final drawings

Step 05 2 – 9 months

Construction

Our crews and site engineers build to the drawings, inspect each stage and report progress every week.

HICONIQUE does

  • Full-time site engineer
  • Build to schedule with stage-by-stage inspections
  • Weekly progress updates with photos, video and reports

You receive

  • Weekly progress reports
  • Inspection records for each stage
  • Payments tied to 10 progress milestones

You prepare

  • Approve finish material samples
  • Attend the main inspections

Apartment interiors take about 2 – 4 months; new townhouses about 6 – 9 months depending on size.

Step 06 1 – 2 days

Handover & Warranty

Final inspection and key handover with complete documents — and we stay with you through the warranty.

HICONIQUE does

  • Deep clean and full system test
  • Final inspection with the owner
  • 12-month construction warranty

You receive

  • As-built documents and operating guide
  • Handover record and warranty card
  • After-sales contact

You prepare

  • Inspect and sign off with HICONIQUE
  • Handover payment
Sample schedule

Inside the construction stage

Example schedule for a new townhouse — 18 work items in sequence, each inspected before the next one starts.

267 construction days (estimate)
01 Permits & site preparation 10 days
02 Setting out & excavation 5 days
03 Foundations / piling 18 days
04 Ground floor structure 15 days
05 Upper floor structure 35 days
06 Roof structure 12 days
07 Masonry walls 18 days
08 Concealed MEP 15 days
09 Internal & external plaster 20 days
10 Waterproofing & testing 10 days
11 Floor screed 7 days
12 Tiling 20 days
13 Ceilings 10 days
14 Skim & paint 20 days
15 Doors & balustrades 12 days
16 MEP fixtures 15 days
17 Built-in joinery 18 days
18 Cleaning, testing, handover 7 days

Indicative only; actual duration depends on size, number of storeys and site conditions.

Payments

Pay as we progress, never everything upfront

Design — 3 instalments

50%On signing
30%On concept approval
20%On final drawings

Construction — 10 milestones

  1. 5% Contract signing / depositContract and appendices signed 5%
  2. 10% Mobilisation & startCrew, site setup, setting out 15%
  3. 15% Foundations completeFoundation inspection with photos 30%
  4. 15% Floor structures completeReinforced concrete inspection 45%
  5. 15% Roof completeRoof structure inspection 60%
  6. 12% Masonry, plaster, screedGeometry and surface inspection 72%
  7. 10% Concealed MEP & waterproofingPressure, seal and flood tests 82%
  8. 10% Tiling, paint, ceilingsSample approval and inspection 92%
  9. 5% Handover for useAs-built documents, operating guide 97%
  10. 3% Warranty retentionPaid when the warranty period ends 100%
Commitments

What you always get with HICONIQUE

See it in 3D first

Renderings and walkthroughs before anything is built.

Transparent estimate

Detailed quantities and materials fixed upfront.

Weekly updates

Photos, video and progress reports every week.

Stage inspections

Every milestone is signed off with photos.

Pay as we progress

Payments follow completed milestones, 3% held for warranty.

12-month warranty

Covers workmanship and material defects.